What Documentation Is Required For A Detailed Quote?
Would you like a quote on your renovation, but don’t know where to start or what to attain?
Minimum Documentation Required
Detailed proposals are unique to each project and require a range of specific documentation.
The minimum documentation required for a detailed quote/proposal includes:
Detailed Architectural Drawings
Engineering Design Drawings
Building Approvals Quotation
Soil Test Report
Utility and Site Surveying
Schedule of Finishes and Fittings
Oztown Constructions work closely with a team of engineers, designers and building approval professionals to help you obtain this documentation.
We are here to guide you through the process from start to finish as your reliable one point of contact.
Our team is here to answer any questions you may have.